Get proposal →
Industrial gas plant at night
● Live — LNG • LPG • CNG • Hydrogen-ready • Est. 2008

GAS THAT
KEEPS INDUSTRY
RUNNING CLEAN.

Diosett Gas designs, builds and services industrial gas infrastructure — from city gate stations to factory burners. 340+ facilities, 99.98% uptime, 17 years without major incident.

★ ISO 9001 / 14001 / 45001★ PED 2014/68/EU★ ATEX certified
2.4 B m³gas delivered / year
99.98%supply reliability
340+plants built
24/7dispatch & service
DIОSETT GAS ◆ LNG SUPPLY ◆ LPG TERMINALS ◆ METERING ◆ SAFETY ◆ DECARBONIZATION ◆ DIОSETT GAS ◆ LNG SUPPLY ◆ LPG TERMINALS ◆ METERING ◆ SAFETY ◆ DECARBONIZATION ◆
01 — About Diosett Gas
Full-cycle gas engineering partner
Our story →
Diosett Gas engineer inspecting gas pipeline
17 years
of zero-compromise gas engineering across Europe & Central Asia

We take gas from the main pipeline — to your burner tip, metered, safe and efficient.

Diosett Gas (diosett-gas.com) was founded as a burner-service workshop and grew into an EPC contractor for industrial gas: pressure reduction stations, LNG regasification, LPG storage, commercial metering, boiler conversion and hydrogen-ready retrofits. We design, permit, build, commission and maintain.

✔ Own fleet: 14 LNG trailers, 6 service labs
✔ In-house design bureau + SCADA team
✔ 68 certified welders & ATEX fitters
✔ Remote monitoring: 1,200+ nodes online

Our mission: make natural gas the cleanest bridge fuel — affordable for factories, safe for cities, ready for biomethane and hydrogen blending up to 20%.

68
engineers
12
countries served
45
patents & methods
0
major incidents
Gas storage tanks illuminated Energy transition sunset over plant Industrial valves and instrumentation
02 — What we do
From wellhead to flame
Request quote
LNG regasification plantLNG / Off-grid

LNG supply & regasification

Satellite LNG plants 0.5–50 t/h, storage 10–500 m³, automatic changeover. We deliver LNG by trailer and guarantee price formula for 3 years.

Gas pressure reduction stationNetworks

Gas distribution & PRS

City gates, district regulation, PE/steel networks, cathodic protection. Turnkey permitting with grid operators and technical supervision.

Industrial burner systemIndustry

Burners, boilers & furnaces

Conversion from diesel/mazut to gas, low-NOx burners, oxygen trim, furnace revamp. Average payback 14 months, −28% fuel cost.

Metering

Smart metering & SCADA

Ultrasonic & turbine meters, flow computers, telemetry to dispatch. Leak detection, pressure analytics, fiscal reporting per MID.

✓ 1,200 nodes online ✓ ±0.5% accuracy

Safety

Safety, ATEX & service 24/7

Risk assessment HAZOP, gas detection, emergency shutdown, annual maintenance contracts with 4h response SLA.

✓ 4h response ✓ spare stock

Green

Biomethane & H₂-ready

Blending skids for biomethane/H₂ up to 20%, CO₂ accounting, ESG reporting. Prepare your plant for 2030 without rebuild.

✓ −42% CO₂ with biomethane

03 — Technology
Diosett OS: every molecule counted

🔷 Digital twin of your gas system

Each PRS, tank and burner gets a digital twin: pressure, temperature, flow, methane slip. AI predicts filter clogging 14 days ahead and auto-orders service.

Digital gas monitoring
01 Survey

Laser scan + thermal audit in 2 days. Heat map of losses.

02 Design

3D model, HAZOP, permits. Fixed price, no extras.

03 Build

Prefabricated skids, 60% faster install, night works possible.

04 Operate

SCADA + 24/7 dispatch + preventive maintenance.

Why prefabricated skids win

We assemble PRS and LNG skids in our factory, test under 1.5× pressure, then plug in on site in 3–5 days. Welds −70%, leaks −92% vs field assembly.

04 — Selected projects
Proof, not promises
Ceramic factory gas conversionCeramics • 12 MW

Ceramic kilns off diesel

6 tunnel kilns converted to LNG + O₂ trim. Fuel −31%, rejects −18%. Payback 11 months.

Food plant steam boilersFood • 8 t/h steam

Dairy steam without interruption

Dual-fuel boilers + 100 m³ LNG reserve. Zero stops during grid maintenance.

Logistics park gas networkLogistics • 4 km network

Logistics park gasified in 90 days

4 km PE network, 3 PRS, 22 metering nodes with SCADA. Tenants connected plug-and-play.

05 — Safety culture
Zero leaks is a system

Gas is safe when engineering is disciplined. Every Diosett site follows 5 barriers: design redundancy, certified welds with 100% NDT, gas detection + ESD, trained operators, remote supervision. Result: 2.1M man-hours without LTI.

✔ 100% welds X-ray / phased array
✔ Dräger gas detection + auto shut-off
✔ Annual emergency drills with client
✔ Insurance up to €10M per project
Safety inspection

ATEX & PED compliance file included

You receive as-built dossier, Ex-register, maintenance logbook and operator training certificates — ready for any inspection.

06 — Newsroom
Latest from the field

Commissionings, LNG price analysis, safety bulletins and regulation updates. Click to read full story.

Subscribe →
LNG

How we cut LNG logistics cost by 19%

New routing + cryo optimization. Full breakdown with numbers from 14 trailers.

Soon →
Safety

5 signs your PRS needs overhaul

Hunting pressure, icing, odor — checklist from our service chief.

Soon →
Regulation

Hydrogen blending: what 20% means for burners

Nozzle, seals, control — what to retrofit now to avoid rebuild later.

Soon →
07 — FAQ
Questions? Answers.

Short, honest, with numbers. For detailed calculation — send your load profile via contact form.

Gas equipment
How fast can you connect us to LNG if no pipeline?

Standard satellite: 45–60 days from contract (design + permits + skid production). Emergency mobile regasifier: 7–10 days rental while permanent plant is built.

What does conversion from diesel to gas cost?

For 2–5 MW boiler house: €120–280k turnkey. With fuel saving 25–35%, payback is typically 11–18 months. We provide bankable calculation.

Do you take permits and grid approvals?

Yes. We handle technical conditions, design approval, construction notice and commissioning act. You sign only power of attorney.

Can our plant use biomethane or hydrogen later?

Yes, all new Diosett skids are H₂-ready (seals, meters, burners rated to 20% H₂). Biomethane is drop-in — only origin certificates needed.

What service SLA do you offer?

24/7 dispatch, 4h arrival in 150 km radius, 24h elsewhere. Annual contract includes 2 preventive visits, filters, calibration and SCADA monitoring.

Clean energy field
08 — Contact

Get your gas roadmap
in 48 hours.

Send consumption (m³/h or t/month), location and fuel now used. We return with concept, budget and payback — free.

Or write: [email protected] • Dispatch 24/7: +00 000 000 000 • Address: Industrial Park, Energy St. 12